8ft tall AquaDams over Flume Pipes, Seattle, WA 2010 (Stabilized)

Stabilized footage of the installation of 8ft, 5ft, and 3ft tall AquaDams over and under (4) 24″ diameter flume pipes in a creek near Seattle Washington. The road bank was being eroded by the stream, so the AquaDams were put in place to isolate the work area to allow reconstruction of the bank in the dry. Flume pipes were used to maintain the passage of water past the work area in a contained fashion.

More info on 8ft tall AquaDams over Flume Pipes, Seattle, WA 2010 (Stabilized)

Leave a Comment